FS#983 — FS#5004 — RBX 1 UPS 4

Attached to Project— Datacenters
Incident
Roubaix 1
CLOSED
100%
After the EDF souce switch of yesterday (http://status.ovh.net/?do=details&id=982 ),
the UPS 4 at Roubaix 1 reported alamrs of a false overload downstream.

The manufacturer is intervening to solve the problem.
Date:  Friday, 07 January 2011, 19:51PM
Reason for closing:  Done
Additional comments about closing:  The manufacturer replaced the measurment card (BUEI) which has a default on the version 2 that we have.

The version 4 which was installed corrects this problem.