We have had a switch of electric arrival with EDF at 05h40.
Datacenter switched to the generator.
The site is once again powered by EDF.
Despite the intervention of Chloride technicians and works on batteries, the 6th room inverter has updated default.
We decided to change all the batteries today,Saturday with the stock we have,without waiting for a good or bad further intervention by the provider.
Update(s):
Date: 2010-12-12 18:09:33 UTC The switch was very successful.
We arrived on the \"normal\" arrival.
Date: 2010-12-12 18:07:40 UTC EDF is on the site to make the return to normal.
We'll start.
Date: 2010-12-11 22:38:31 UTC Since this morning,the datacenter have been powered by the second EDF cable which powers the building.