FS#906 — FS#4935 — Rbx1: EDF switch

Attached to Project— Datacenters
Incident
Roubaix 1
CLOSED
100%
We have had a switch of electric arrival with EDF at 05h40.
Datacenter switched to the generator.
The site is once again powered by EDF.

Despite the intervention of Chloride technicians and works on batteries, the 6th room inverter has updated default.
We decided to change all the batteries today,Saturday with the stock we have,without waiting for a good or bad further intervention by the provider.

Date:  Sunday, 12 December 2010, 19:09PM
Reason for closing:  Done
Comment by OVH - Saturday, 11 December 2010, 23:38PM

Since this morning,the datacenter have been powered by the second EDF cable which powers the building.

It was not possible to set things back to normal because of the UPS7 inverter which was not in good conditions:
http://status.ovh.co.uk/?do=details&id=890&PHPSESSID=10af6c7145e1b10dd5c82d9042afa7b9

The problem is fixed now,we took an appointement with EDF in order to perform the manipulation tomorrow between 8 and 9 o'clock.


Comment by OVH - Sunday, 12 December 2010, 19:07PM

EDF is on the site to make the return to normal.
We'll start.


Comment by OVH - Sunday, 12 December 2010, 19:09PM

The switch was very successful.
We arrived on the "normal" arrival.