OVHcloud Bare Metal Cloud Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
FS#12828 — VPS Low Latency - Globalswitch / Dallas / San Jose / Chicago
Scheduled Maintenance Report for Bare Metal Cloud
Completed
Migration of the VPS on the Dallas /San Jose/Chicago PoP will begin on Wednesday 18 March at 10:00 (GMT +1).

Migration of the Globalswitch PoP will follow the day after at 23:30 (GMT +1).

VPS on the Dallas/San Jose/Chicago POP will be migrated to our BHS infrastructure and those in Paris/Globalswitch will be migrated to Roubaix.

The sychronisation of the VPS and the migration of the routing is expected to cause downtime.

Update(s):

Date: 2015-03-19 07:11:16 UTC
All migrations are completed.

Date: 2015-03-19 07:09:01 UTC
We start GSW DC.

Date: 2015-03-18 10:45:04 UTC
DAL OK. We will continue with CHI.

Date: 2015-03-18 09:36:48 UTC
We start with DAL DC.
Posted Mar 13, 2015 - 15:19 UTC