Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
A reboot is required on this equipment to apply
carving policy. Database, hardware resources will be
segmented in a manner for optimization according to our usage. With the customization of hardware profiles, we will get
full use of the switches.
Maintenance will be held tonight starting at 11:30 PM.
Update(s):
Date: 2015-01-09 04:21:10 UTC The operation is complete. We have corrected some differences in configurations on ports.
Date: 2015-01-09 04:19:40 UTC The second switch rebooted properly.
Date: 2015-01-09 04:19:22 UTC The reboot was performed without incidents.
We are moving to the second switch.
Date: 2015-01-09 04:18:56 UTC We are rebooting sbg2-12a-n6.
Date: 2015-01-09 04:18:42 UTC The reboot was performed without incidents. Four machines have had a cut-off for a few seconds, one of them a few minutes. The second switch gradually resumes charging and it does not accept configurations that we set.
Date: 2015-01-09 04:17:12 UTC We rebooted the second switch.
Date: 2015-01-09 04:16:58 UTC We started the operation with a shut/no shut for some ports.
Date: 2015-01-08 10:02:37 UTC After investigation, even though the speed on the interfaces is correct, the protocol is continuing to have problems in communication.
The port speeds are of type 1, this is to say that if there is a cut there will be a loss in redundancy.
A shut/no shut (an operation that takes around 2 seconds) will be necessary to put back in place all the information to reestablish perfect redundancy.
Date: 2015-01-08 06:26:53 UTC We stopped this maintenance for the moment. We'll dig tomorrow to understand and find the source of this behaviour.
Date: 2015-01-08 06:25:50 UTC All ports passed to suspended on the second switch :
2012 May 5 23:36:37 sbg2-11b-n6 %ETHPORT-3-IF_ERROR_VLANS_SUSPENDED: VLANs 1-6,8,20,100-101,340-343,4051-4065 on Interface port-channel4096 are being suspended. (Reason: vPC peer is not reachable over cfs)
Date: 2015-01-08 06:25:28 UTC sbg2-11a-n6# reload
WARNING: This command will reboot the system
Do you want to continue? (y/n) [n] y
[8043266.161213] Shutdown Ports..
[8043266.197669] writing reset reason 9,
Broadcast message from root (ttyS0) (Mon OctSending all processes the TERM signal...
Date: 2015-01-08 06:25:19 UTC We started the operation by sbg2-11a-n6 .. No incident expected since traffic is managed by the second switch.