The upgrade is scheduled for Thursday, January 26th at 8 am UTC + 1. Traffic will be rerouted during the operation.
Before beginning the upgrade, we will reroute the MIX traffic.
The traffic is up on the new 2*10G. The exchange point must make some changes for us to get 4*10G.
There we go. The 4 10G links are operational :)
Powered by Flyspray OVH RSS
The upgrade is scheduled for Thursday, January 26th at 8 am UTC + 1.
Traffic will be rerouted during the operation.
Before beginning the upgrade, we will reroute the MIX traffic.
The traffic is up on the new 2*10G. The exchange point must make some changes for us to get 4*10G.
There we go. The 4 10G links are operational :)