FS#571 — FS#4622 —shared Iinfra maintenance
Attached to Project— Network
Maintenance | |
paris 19 | |
CLOSED | |
![]() |
Tonight, we will upgrade the 2 switches of the head of the shared network at P19. The maintenance should have no impact since the switches are alternatively updated.
Date: Wednesday, 22 September 2010, 01:40AMReason for closing: Done
We are starting the p19-53-n5 upgrade
The standard upgrade procedure is not operational:
Version Compatibility check failed. Return code 0x40930062 (free space in the filesystem is below threshold).
We are updating it "manually"
p19-53 is updated, we are dealing with p19-54
p19-54 is updated