FS#536 — FS#4592 — cloud/vrack network
Attached to Project— Network
Modernization | |
Whole Network | |
CLOSED | |
![]() |
We upgrade the Nexus switches in the network cloud/vrack in order to solve problems of DHCP related to the functioning with the mode dual-home of fex (one fex connected on two different chassis). In order to minimize the impact, we set up a completely separate infra and switch links one by one (few seconds of interruption by link).
Date: Thursday, 23 September 2010, 12:33PMReason for closing: Done
Additional comments about closing: on Friday, 17 septembre 2010, 03:35
The upgrade is ongoing.
1/3 of the infrastructure is updated.
We will finish the upgrade tonight.
on Friday, 17 September 2010, 00:19
We take the upgrades
on Friday, 17 September 2010, 00:33
The 48 port 4th module has been switched.
Cut about 1 minute.
We prepare for the 5th module.
Friday, 17 September 2010, 01:23
The 48 port 5th module has been switched.
Cut about 1 minute.
We prepare for the 6th module.
on Friday, 17 September 2010, 01:45
The 48 port 6th module has been switched.
Cut about 1 minute.
We prepare for the 7th module.
on Friday, 17 September 2010, 02:09
The 48-port 7th module has been switched.
Cut about 1 minute.
We prepare for the 8th module.
on Friday, 17 September 2010, 03:35
All migrations are completed.