FS#526 — FS#4583 — Paris 19: batteries replacement on a UPS 1 and UPS 5
Attached to Project— Datacenters
Maintenance | |
Paris 19 | |
CLOSED | |
![]() |
We will proceed to the batteries replacement on these two
UPSs (lifetime achieved). It will be held on the 16th and 17th
of September 2010.
During the operations, the UPSs will be by-passed.
Date: Wednesday, 29 September 2010, 19:32PMUPSs (lifetime achieved). It will be held on the 16th and 17th
of September 2010.
During the operations, the UPSs will be by-passed.
Reason for closing: Done
Additional comments about closing: The replacement of the batteries was conducted.
The replacement of the batteries has started this morning.
The provider is on the scene in order to start the replacement of the UPS 5 batteries.
The uninterruptible power supply will be by-passed during the manipulation (room 0 , 2 , 5.1).