Tonight around 1am we will upgrade the optic equipment version in Northern France.
This upgrade aims to support 10G lambdas, no downtime planned. This operation is transparent.
Update(s):
Date: 2013-07-26 02:15:02 UTC POP2 OK.
Date: 2013-07-26 02:14:56 UTC hau ok, doing pop2.
Date: 2013-07-26 02:14:44 UTC rsa and stm ok, doing hau and can..
Date: 2013-07-26 02:14:24 UTC ron and tou ok, doing rsa and stm..
Date: 2013-07-26 02:14:05 UTC was and san ok, doing ron and tou..
Date: 2013-07-26 02:13:40 UTC tri and hel ok, doing was and san..
Date: 2013-07-26 02:12:40 UTC lzi and asc ok, doing tri and hel..
Date: 2013-07-26 02:12:27 UTC pil and lqn ok, doing lzi and asc..
Date: 2013-07-26 02:12:17 UTC ble59 ok, doing pil59 and lqn59..
Date: 2013-07-26 02:12:05 UTC boi59 ok, doing ble59..
Date: 2013-07-26 02:11:59 UTC fac59 ok, doing boi59..
Date: 2013-07-26 02:11:17 UTC sec59 ok, doing fac59..
Date: 2013-07-26 02:11:08 UTC lib59 ok, doing sec59..
Date: 2013-07-26 02:11:01 UTC pop-1 ok, doing lib59..
Date: 2013-07-26 02:10:51 UTC upgrading service cards of pop-1.
Date: 2013-07-19 02:10:32 UTC We delayed the intervention on Lille's optical loop to Monday night.
Date: 2013-07-17 23:30:19 UTC Thereafter the issue on this task http://status.ovh.net/?do=details&id=5050, we are postoponing the intervention on the optical loop Lille to tomorrow Friday the 19th at 01:00.
Date: 2013-07-17 23:27:27 UTC upgrading pop-1 modules.
Date: 2013-07-17 23:27:10 UTC rebooting pop-1
Date: 2013-07-17 23:27:03 UTC we will start with pop-1