Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
We will be taking action on the Roubaix <> Paris TH2 liaison in preparation for migration onto the coherent 100G. The operation consists of replacing 2 cards(BMM-4) with the new hardward version (BMM2-8). We expect approx. 30mins to 1hr downtime. The Roubaix <> Paris traffic will be routed via GSW during this period.
We are starting these works tonight (from 15 to 16) at 00:30 CEST.
Update(s):
Date: 2013-05-16 00:49:58 UTC All the circuits are forwarded. The traffic is flowing properly.
Date: 2013-05-16 00:24:55 UTC We are recovering the traffic.
Date: 2013-05-16 00:02:45 UTC We are replacing BMM cards in Roubaix and TH2.
Date: 2013-05-16 00:02:11 UTC All 10G circuits are disabled between Roubaix and TH2 and Roubaix and Strasbourg.
Date: 2013-05-16 00:01:22 UTC We are starting the intervention.