Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
Due to fiber works close to the fluvial port in Lille (fixing a damaged cable), our optical links Roubaix <> London and Roubaix <> Paris TH2 will be interrupted tonight 26/03 (night of 25 to 26) from 00hOO CET. Expected cutoff duration is 2 hours.
Update(s):
Date: 2013-03-25 23:57:34 UTC The link to Paris TH2 is UP for now.
Date: 2013-03-25 23:56:24 UTC The link to London has been recovered.
Date: 2013-03-25 23:50:01 UTC Works have began. The optical protection to London has fully played its role, the 20 circuits 10G protected to London have been immediately switched to the backup path by Amsterdam.
Date: 2013-03-25 23:47:44 UTC circuits to London will be highly protected by 20x10G and works are being held recently on the optical buckle Infinera Roubaix <> London <> Amsterdam <> Brussels <> Roubaix (protection of circuits in London by Amsterdam).