FS#4193 — FS#8127 — rbx-s50

Attached to Project— Dedicated Cloud
Incident
Backend / Core
CLOSED
100%
We had an electric incident on this router.

One of the power supplies has been stopped.

Feb 27 10:16:35 GMT: %C6KPWR-SP-4-INPUTCHANGE: Power supply 1 input has changed. Power capacity adjusted to 2671.20W
Feb 27 10:16:35 GMT: %C6KPWR-SP-4-PSOUTPUTDROP: Power supply 1 output has dropped

Therefore, 2 routing cards are shut down.

We are investigating.
Date:  Wednesday, 27 February 2013, 12:05PM
Reason for closing:  Done
Comment by OVH - Wednesday, 27 February 2013, 12:04PM

The 2 power supplies are back.

1 WS-CAC-6000W 5771.64 137.42 OK OK on
2 WS-CAC-6000W 5771.64 137.42 OK OK on

The 2 cards are online.

Feb 27 10:45:06 GMT: %OIR-SP-6-INSCARD: Card inserted in slot 11, interfaces are now online
Feb 27 10:47:38 GMT: %OIR-SP-6-INSCARD: Card inserted in slot 12, interfaces are now online

The traffic is back.