We will carry on the replacing switches session in order to improve the redundancy on some equipments.
The maintenance will be done Saturday, 03/11/2012 between 6am and 8am, and will cause a network cut-off on the networks below:
94.23.57.0/24
94.23.193.0/24
94.23.196.0/24
94.23.197.0/24
Date: Tuesday, 13 November 2012, 08:06AMThe maintenance will be done Saturday, 03/11/2012 between 6am and 8am, and will cause a network cut-off on the networks below:
94.23.57.0/24
94.23.193.0/24
94.23.196.0/24
94.23.197.0/24
Reason for closing: Done
We will start the maintenance.
We have switched the following network this Tuesday morning (13/11/12 between 6h and 8h):
94.23.56.0/24
94.23.57.0/24
94.23.58.0/24
94.23.59.0/24
94.23.60.0/24
94.23.61.0/24
94.23.62.0/24
94.23.63.0/24