FS#3022 — FS#6871 — SBG Network
Attached to Project— Network
Modernization | |
Strasbourg 1 | |
CLOSED | |
![]() |
We implement the new architecture:
There will be a couple of ASR9000 and of nexus5000 to which the chassis 6500 will be connected.
All traffic will flow through the RAS that will route the traffic to the backbone (TH2 / GSW and FRA).
Date: Friday, 06 July 2012, 17:21PMThere will be a couple of ASR9000 and of nexus5000 to which the chassis 6500 will be connected.
All traffic will flow through the RAS that will route the traffic to the backbone (TH2 / GSW and FRA).
Reason for closing: Done
We connect the N5.
N5 are now connected.
The RSCs are also connected.
We activate the OSPF so that equipment will be accessible by the network.
We will bring into production the ASRs at 00:00 (CEST).
That is why the traffic between SBG and fra-5-6k then between SBG and th2-g1-a9 will be temporarily interrupted.
We start.
We migrate fra-5-6k on sbg-g2-a9.
We migrate th2-g1-a9 on sbg-g1-a9.
We will add a link between the 2 ASR routers.
Finally, no :)