FS#297 — FS#4381 — P19/DC1

Attached to Project— Datacenters
Maintenance
Existing
CLOSED
100%
We noticed a new interruption in one of electric arrivals
on the part of Paris 19.

The P19, powered by 20000V, switched on the second arrival.

The DC1, 400V by powered, switched on generators.
The interruption in this section lasted more than 30 minutes. Then
electricity was back. DC1 switched back on the EDF.

After the contact of ERDF, we are informed that the source post is
down. It needs 2 to 4 days to be repaired.

P19, so we will stay on the arrival 2.
DC1 everything is in order.
Date:  Thursday, 15 July 2010, 09:42AM
Reason for closing:  Done