rssLink RSS for all categories
 
icon_red
icon_green
icon_red
icon_red
icon_blue
icon_green
icon_green
icon_red
icon_red
icon_red
icon_orange
icon_green
icon_green
icon_green
icon_green
icon_blue
icon_green
icon_orange
icon_red
icon_green
icon_red
icon_red
icon_green
icon_red
icon_red
icon_red
icon_red
icon_orange
icon_green
 

FS#2932 — FS#6893 — FA1 London/Newark

Attached to Project— Network
Incident
Whole Network
CLOSED
100%
2x10G that we have between London and Newark,NJ
son the FA1 are down.

with the 4x10G of TGN down since 2 weeks
http://status.ovh.net/?do=details&id=2853
We have rerouted certain US trafic via
EU.
Date:  Sunday, 17 June 2012, 22:25PM
Reason for closing:  Done
Comment by OVH - Sunday, 17 June 2012, 15:53PM

we had to reroute the traffic from peering point
from Palo Alto, Los Angeles and Miami via Europe.


Comment by OVH - Sunday, 17 June 2012, 21:03PM

The link came back up after having sent the email
to the Global Reliance NOC. We think it is
human error. We come to restore the traffic
on Miami, Palo Alto and Los Angeles.


Comment by OVH - Sunday, 17 June 2012, 22:24PM

The cable is supplied with electrical power
by 2 stations 2 located at Skewjack, U.K. and
Northport, U. S. The two stations were down
electrically at the same time.