FS#2656 — FS#6614 — Marseille optical loop : set up of CAV13

Attached to Project— ADSL / SDSL
Modernization
Backend / Core
CLOSED
100%
We intervene tomorrow on the optical loop #1 composed of the NRAs :

JOL13, FER13, COR13, DRA13, PRA13, SMG13, STM13, SML13, BEA13, MEN13, GAR13, NAP13

We set up the NRA CAV13 and we finalise the securisation working of the loop.
The workings are expected to take place the whole day from 9:00 to 18:00.

No interruption is expected on the NRAs which are already in production.
Date:  Saturday, 21 April 2012, 03:16AM
Reason for closing:  Done