We have detected a \"pressure\" fault on the transformer 1 of a Roubaix 2.
Even if the transformer didn't stop, we switched the load to the backup transformer when the problem was detected.
In order to avoid waiting the expertise result for this transformer, we will replace it tomorrow morning with another one that we have in our stock (and then try to fix the defected one if possible).
The work will begin tomorrow at 8am and should be done before 3 pm.
Everything is done in order to recover the redundancy before the weekend.
All these operations didn't impact the servers thanks to the installations redundancy. The work will be done tomorrow under the same conditions.
Update(s):
Date: 2012-02-17 16:39:33 UTC The working were done as expected. The transformer was replaced and the TGBT has again its redundance.
the analysis on the defected transformer were done this morning. We are waiting for the verdict.
Date: 2012-02-17 16:33:53 UTC This transformer 20KV/410V is broken. We switched on the spare transformer to do the maintenance