FS#230 — FS#4312 — Nerim and Panap
Attached to Project— Network
Maintenance | |
Whole Network | |
CLOSED | |
![]() |
We move the links to a new equipment. The traffic will be interrupted during the switch (around <1min).
Date: Friday, 25 June 2010, 12:15PMReason for closing: Done
Additional comments about closing: The switch was finalised. With this migration, the router is ready for the introduction of our new fibre link Paris<>Francfort.