FS#183 — FS#4271 —Virtual rack
Attached to Project— Network
Modernization | |
Whole Network | |
CLOSED | |
![]() |
We will put in use new links aiming at improving the inter-servers transfer rate of your virtual bay. A cut off of 1 to 2 seconds
is anticipated on the tagged interfaces of the servers composing your virtual bay.
This intervention aims at putting in use the virtual bay in the "no-protected" mode as well. The communications between your machines
will be faster and will no longer go through the routers of infrastructure.
You will receive an email once this operation is finalized.
Date: Thursday, 10 June 2010, 01:15AMis anticipated on the tagged interfaces of the servers composing your virtual bay.
This intervention aims at putting in use the virtual bay in the "no-protected" mode as well. The communications between your machines
will be faster and will no longer go through the routers of infrastructure.
You will receive an email once this operation is finalized.
Reason for closing: Done
10 % of virtual bay were switched...
20% of virtual bay were switched...
35% of virtual bay were switched...
50% of virtual bay were switched...
75% of virtual bay were switched...