We are going to launch the first optical buckle tonight around 11h00. that's why we have to cut the NRA, PIL, BLE, BOI, FAC, SEC and LIB.
This launching is expected during an important part of night when internet access are cut.
Thank you for your understanding !
We will keep you informed of all different steps.
Update(s):
Date: 2011-09-09 16:52:21 UTC The problem is at the level of the routing.
We are changing the router. The wiring is in progress.
All the NRA will be recables in the following minutes.
Date: 2011-09-09 16:49:54 UTC There was latency periods and packets losses on the NRA of BLE59.
We intervened on the spot to change certain passive euipments on the site.
We have a better one but we still have some problems.
We are still looking at the level of the routing.
Date: 2011-09-09 05:51:17 UTC NRA, LIB, SEC, FAC, BOI, BLE and PIL Routing are again UP.
Date: 2011-09-09 05:50:21 UTC All optical equipments are implemented. We need a link to finalise the buckle. We faced a problem while implementation. All sites are fixed and calibrated. We will accomplish the routing and work tonight.
Date: 2011-09-09 05:47:53 UTC SEC FAC and BOI sites are related optically. We are setting the BLE site in order to include it in the optical buckle. We are re-establishing meanwhile the traffic.
Date: 2011-09-08 23:44:20 UTC PIL and LIB sites are attached optically on the POP of Roubaix.
Date: 2011-09-08 23:43:35 UTC Optical fibers are switched on the optical chassis. We are starting work to mount the optical rings.