In order to offer the system of ACE load balancing
VPN cards and firewalls we'll change the
configuration between routers and PCC switches.
The goal is to reduce the number of VLANs used by the
customer while offering all the services.
During maintenance, there is no failure to predict.
As against the MRTG graphs will jump. operations
of configuration's modification are blocked.
Update(s):
Date: 2011-08-11 21:51:32 UTC Mod Ports Card Type Model Serial No.
--- ----- -------------------------------------- ------------------ -----------
1 6 Firewall Module WS-SVC-FWM-1
2 1 Application Control Engine Module ACE20-MOD-K9
3 0 2-subslot Services SPA Carrier-600 WS-SSC-600
It's fine, go baby :)
Date: 2011-08-11 21:50:53 UTC We will keep it on the status:s5 on the new IOS wan and s6 on IOS standard.
Then,we will insert the cards: firewall, ace and vpn in s5.
Date: 2011-08-11 21:48:54 UTC The card was replaced.Traffic will be relaunched on s5.
Date: 2011-08-11 13:15:12 UTC We replace the card.
Date: 2011-08-11 12:11:18 UTC dead. it must be replaced.
rbx-s5-6k (config) # no power enable module 11
Date: 2011-08-11 12:09:42 UTC Aug 11 11:22:08.945: DFC9: Currently running ROMMON from S (Gold) region
Aug 11 12:22:22 GMT: %EARL_L2_ASIC-DFC11-4-DBUS_HDR_ERR: EARL L2 ASIC #0: Dbus Hdr. Error occurred. Ctrl1 0xB0000EBD
Aug 11 12:22:31 GMT: %DIAG-SP-6-RUN_MINIMUM: Module 1: Running Minimal Diagnostics...
Aug 11 12:22:42 GMT: %PM_SCP-SP-1-LCP_FW_ERR: System resetting module 11 to recover from error: Linecard received system exception. Errcode = 2809000001
Aug 11 12:22:42 GMT: %OIR-SP-3-PWRCYCLE: Card in module 11, is being power-cycled 'Off (Module Reset due to exception or user request)'
Aug 11 12:22:42 GMT: %C6KPWR-SP-4-DISABLED: power to module in slot 11 set Off (Module Reset due to exception or user request)
Aug 11 12:40:05 GMT: %L2_AGING-SP-4-ENTRY_DNLDFAIL: Slot 11: Download entries failed, reason EARL_ICC_ERR
Aug 11 12:40:05 GMT: %ONLINE-SP-6-LCC_CONFIG_FAIL: Module 11. LCC Client UNSOLICITED SCP failed to configure at 4163D3C8
Aug 11 12:40:05 GMT: %ONLINE-SP-6-INITFAIL: Module 11: Failed to configure forwarding
sm(cygnus_oir_bay slot11), running yes, state wait_til_online
Last transition recorded: (disabled)-> disabled2 (restart)-> wait_til_disabled (timer)-> may_be_occupied (timer)-> occupied (known)-> can_power_on (yes_power)-> powered_on (real_power_on)-> check_power_on (timer)-> check_power_on (power_on_ok)-> wait_til_online (reset_timer_online)-> wait_til_online
Aug 11 12:40:05 GMT: %C6KPWR-SP-4-DISABLED: power to module in slot 11 set off (Module Failed SCP dnld)
Well dead card.
Date: 2011-08-11 11:16:11 UTC oops. we have to update routers with IOS
wan to support cards of VPN services.
Date: 2011-08-11 09:40:57 UTC it's good.
The maintenance is completed.
more than patching scripts ..
Date: 2011-08-11 09:39:54 UTC s6 is in routing.
it verifies the configuration's parallel between the two routers.
Date: 2011-08-11 09:38:13 UTC s5 has been reconfigured.
returned to the routing. we expect the synchronization
Date: 2011-08-11 09:28:00 UTC rbx-s5-6k(config-if)#shutdown
Date: 2011-08-11 09:27:49 UTC everything is on the s6. the s5 no longer rout.
Date: 2011-08-11 09:27:00 UTC We switch the traffic on the s6.
Date: 2011-08-11 09:26:28 UTC We are at 50%. Let's go for s5.
Date: 2011-08-11 09:25:23 UTC It is put back in routing.
Delivered. The two routers are in the infra.
The s5 with the old conf. The s6 with the new conf.
Date: 2011-08-11 09:24:19 UTC The s6 reconfiguration is complete.
Tested. it works.
We put the router in the infra.
Delivered.
Waiting for the synchronization of OSPF / BGP / HSRP
Date: 2011-08-11 09:22:12 UTC s6 is out of the routing.
We change the configuration.
Date: 2011-08-11 09:19:54 UTC traffic no longer passes through s6. the s5 router ensures 100%
of routing.
Date: 2011-08-11 09:18:43 UTC We unconfigured useless ports.