FS#15435 — Replacement of atl-1-6k
Attached to Project— Network
Modernization | |
Backbone US | |
CLOSED | |
![]() |
Hi,
We planned the replacement of atl-1-6k in our Pop in Atlanta. A new ASR 9K will be installed.
Operation planned on November, 8th,between 10:00 and 12:00am FR time.
This POP will be isolated during the maintenance.
Thanks a lot.
Regards
Date: Monday, 12 November 2018, 09:48AMWe planned the replacement of atl-1-6k in our Pop in Atlanta. A new ASR 9K will be installed.
Operation planned on November, 8th,between 10:00 and 12:00am FR time.
This POP will be isolated during the maintenance.
Thanks a lot.
Regards
Reason for closing: Done
Hello,
This change has been completed on Friday, the 9th.