FS#15422 — Upgrade N3
Attached to Project— Network
Maintenance | |
Whole Network | |
CLOSED | |
![]() |
We will proceed the update of NXOS this 5th October 2018 between 00h00 and 06h00AM (GMT +2)
The equipements that will be updated:
Rack: G101B14 Switch: gra1-sdtor257b-n3
Rack: G101B15 Switch: gra1-sdtor257a-n3
Rack: 54B14 Switch: rbx4-sdtor4b-n3
Rack: 54B17 Switch: rbx4-sdtor10a-n3
Rack: 71A37 Switch: sbg2-sdtor1b-n3
Date: Friday, 05 October 2018, 00:14AMThe equipements that will be updated:
Rack: G101B14 Switch: gra1-sdtor257b-n3
Rack: G101B15 Switch: gra1-sdtor257a-n3
Rack: 54B14 Switch: rbx4-sdtor4b-n3
Rack: 54B17 Switch: rbx4-sdtor10a-n3
Rack: 71A37 Switch: sbg2-sdtor1b-n3
Reason for closing: Done
We will begin the maintenance.
The maintenance ended succesfully.