FS#15405 — Device upgrade on WAW
Attached to Project— Network
Software Upgrade | |
Warsawa → WAW-1 | |
CLOSED | |
![]() |
We're going to proceed with a software upgrade on every top of rack devices impacted by a software bug, located in WAW.
The maximum expected impact is a 10 min traffic disruption.
Maintenance window starts at 23:00 UTC+2 and ends at 03:00 UTC+2, on the 6th of September.
Here is the list of the involved racks :
W01A11-W01A21, W01B01-W01B11, W01B17-W01B21
W03A01, W03A04-W03A05, W03B08-W03B09, W03B12-W03B13
W11A01-W11A20
W13A01-W13A21, W13B01-W13B07
W14A01
Date: Friday, 07 September 2018, 02:28AMThe maximum expected impact is a 10 min traffic disruption.
Maintenance window starts at 23:00 UTC+2 and ends at 03:00 UTC+2, on the 6th of September.
Here is the list of the involved racks :
W01A11-W01A21, W01B01-W01B11, W01B17-W01B21
W03A01, W03A04-W03A05, W03B08-W03B09, W03B12-W03B13
W11A01-W11A20
W13A01-W13A21, W13B01-W13B07
W14A01
Reason for closing: Done