FS#15241 — Brussels PoP, Upgrade
Attached to Project— Network
Software Upgrade | |
Backbone EU | |
CLOSED | |
![]() |
We will upgrade those equipment in the latest versions recommended:
> bru-1-a9
> bru-1-a72
> bru-bru1-bb2-a9
> bru-bru1-bb2-a72
The objective on the Arista a72 is to improve the stability of the equipment. On the ASR9k, the objective is to fix the bug on the NP of the linecards.
Both equipment will be isolated before maintenance, and traffic will flow to other peering points.
We plan to do this maintenance on Saturday 6th of January at 00:00am (UTC).
Weathermap: http://weathermap.ovh.net/#europe
Date: Friday, 29 December 2017, 09:35AM> bru-1-a9
> bru-1-a72
> bru-bru1-bb2-a9
> bru-bru1-bb2-a72
The objective on the Arista a72 is to improve the stability of the equipment. On the ASR9k, the objective is to fix the bug on the NP of the linecards.
Both equipment will be isolated before maintenance, and traffic will flow to other peering points.
We plan to do this maintenance on Saturday 6th of January at 00:00am (UTC).
Weathermap: http://weathermap.ovh.net/#europe
Reason for closing: Done
Additional comments about closing: This maintenance is postpone