OVHcloud Network Status

Current status
Legend
  • Operational
  • Degraded performance
  • Partial Outage
  • Major Outage
  • Under maintenance
vss-8b-6k
Scheduled Maintenance Report for Network & Infrastructure
Completed
Summary: We will replace the defective module.
Impact: No impact.
Start Time: 2017-12-01 02:00 (UTC)
End Time: 2017-12-01 02:45 (UTC)
Duration: 45min

http://travaux.ovh.com/?do=details&id=28651


Update(s):

Date: 2017-12-05 14:41:19 UTC
The module has the hardware issue and we will replace it with the spare one.

Date: 2017-12-05 03:15:54 UTC
The module not detected by vss-8b-6k:
Dec 5 03:10:41.842: %ONLINE-SP-6-REGN_TIMER: Module 9, Proc. 0. Failed to bring online because of registration timer event
Dec 5 03:10:41.842: %C6KPWR-SP-4-DISABLED: power to module in slot 9 set off (Module Failed SCP dnld)
Will check this issue with Cisco techs.

Date: 2017-12-01 15:40:25 UTC
The maintenance has been rescheduled:
Summary: We will replace the defective module.
Impact: No impact.
Start Time: 2017-12-05 02:00 (UTC)
End Time: 2017-12-05 02:45 (UTC)
Duration: 45min
Posted Nov 27, 2017 - 19:08 UTC