FS#1493 — FS#5483 — Internal routing, collect operator

Attached to Project— ADSL / SDSL
Modernization
Backend / Core
CLOSED
100%
Since February, there has been an internal routing problem at a
collect operator. Instead of moving directly to our links dedicated
to the collect, the traffic moved through our peering. The peering being on Paris,
all the traffic moves through Paris even if you had chosen an LNS at
Bordeaux, Lyon or Marseille.

The routing has been rectified and you can now go directly through the chosen
LNS and you are faster on the OVH network.
Date:  Thursday, 15 December 2011, 14:41PM
Reason for closing:  Done
Additional comments about closing:  Everything is OK from OVH and sfr's side.

The switch is done.
Comment by OVH - Tuesday, 31 May 2011, 20:43PM

Some problems persist on the routing between the collecting operator
and OVH. The incident is being solved between our teams.


Comment by OVH - Thursday, 03 November 2011, 13:53PM

There are problems persisting on the routing between the collect operator and OVH. The incident is being resolved between our teams.


Comment by OVH - Friday, 09 December 2011, 01:50AM

We will make some tests on the links of tests in order to validate the architecture.


Comment by OVH - Friday, 09 December 2011, 01:52AM

We modified the network characteristics of the links between OVH and SFR in order to make our tests.

The LNS Paris / Roubaix / Marseille / Bordeaux / Lyon are ready.


Comment by OVH - Friday, 09 December 2011, 01:59AM

The migration from SFR's side was done.

Now we are going through the concentration BAS located in Paris. The connections are directly established from the DSLAM if it is configured on Level 3 or by BAS as close as possible if the DSLAM are on Level 2.

The old sessions are still connected by the BAS in Paris. For the next reconnection, the new path will be taken.

Tonight we will resetet all PPP connections in order to switch to the new architecture.


Comment by OVH - Friday, 09 December 2011, 02:00AM

The first accounts on roubaix are cut.
The cuts takes only a few seconds.


Comment by OVH - Friday, 09 December 2011, 02:00AM

LNS Roubaix done.


Comment by OVH - Friday, 09 December 2011, 02:01AM

LNS Marseille done.


Comment by OVH - Friday, 09 December 2011, 02:01AM

Bordeaux done.


Comment by OVH - Friday, 09 December 2011, 02:01AM

Lyon done.


Comment by OVH - Friday, 09 December 2011, 02:01AM

Paris done.

All PPP sessions are now on the new architecture.

Tomorrow we will check with SFR that everything is alright from both sides.