FS#14867 — syd-g1-a72 <> TELSTRA
Attached to Project— Network
Maintenance | |
Sydney | |
In progress | |
![]() |
To improve the quality of our pni with Telstra a joint maintenance is in progress on this link.
The operation have been postponed to friday 14/07/2017 same timeslot.
We will clean-up the fiber and change the optical module between Telstra and us. The trafic transiting through Telstra will be rerouted through LAX during the maintenance. We start to isolate the link
We are checking the optical level with Telstra
We bring up the port to telstra and latency are ok now. Telstra have to check in an other DC the optical level, but it's will not impact the traffic