FS#5352 — Electrical maintenance rooms 20 and 25
Scheduled Maintenance Report for Network & Infrastructure
Completed
As a result to the problem that has been met on UPS 3 in Rbx2 (http://status.ovh.net/?do=details&id=1335),
we need to perform a maintenance on the rooms 20 and 25. The B track will be isolated on both
rooms. The dual alimentation of each server will keep the servers running.

We prepare the work and the operation should take place around 15h30 - 16h.






Update(s):

Date: 2011-05-05 08:43:20 UTC
The maintenances on room 20 and 25 are finished.

Date: 2011-05-03 13:51:11 UTC
The tasks on UPS 3 are finished.

We will benefit from these tasks in order to add an inverter on one of the channels of room
25. The channel A of the room 25 will be cut off from 13h30 till 17h.

The double power supply of each server will help maintaining the servers operational.

Date: 2011-04-15 14:26:38 UTC
We start the maintenance.
Posted Apr 15, 2011 - 11:53 UTC