Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
To use the 16QAM, we need to change the configuration of transponders on two optical circuits.
To change the configuration of transponders, we need to cut the circuits.
We will cut off the first circuit to reconfigure the cards, check them online and then we'll move on to the 2nd one.
Update(s):
Date: 2016-05-05 15:46:25 UTC Both circuits are ready o receive additional 2x100G.
Date: 2016-05-05 15:45:44 UTC The configuration for the 2nd circuit is complete.
The circuit is up.
We are updating the licenses.
Date: 2016-05-05 15:44:57 UTC The configuration for the first circuit is complete.
The circuit is up, we are moving on to the second circuit.
Date: 2016-05-05 15:44:05 UTC We are cutting the first circuit.
During the break, traffic will flow through the remaining 5x100G