FS#12849 — FS#17728 — Lyon optical loop
Attached to Project— ADSL / SDSL
Maintenance | |
Backend / Core | |
CLOSED | |
![]() |
Following a performance drop of signal on the optical loop of Lyon, we will
work on the lal69 site to replace an attenuator.
Date: Tuesday, 26 April 2016, 19:54PMwork on the lal69 site to replace an attenuator.
Reason for closing: Done
A technician is on site.
Intervention complete. We have replaced attenuator 2dB by 10dB.
We will now work on mpl69.
We have removed -5dB attenuator on the mpl69 site.
No more CRC are detected in the loop.