We install now a 5th generator for our datacentre of Roubaix 1 and 3.
However, generators will be interrupted today Monday, the 21th of March
to develop electrical equipments connecting this latter group to
precedents. Work at this level will be completed tonight.
Update(s):
Date: 2011-03-29 15:06:40 UTC On the next days, we will multiply the generators' groups.
Date: 2011-03-29 14:59:57 UTC The problem was fixed.
The 5 groups function at the same time.
Date: 2011-03-29 14:57:28 UTC The first test has revealed communication problems between the last group and the others.
The installer has modified the necessary parameters, we will proceed to a new test.
Date: 2011-03-29 14:54:56 UTC The maintenance tasks will be finished, the main generators' group was successfully tested when empty.
We will now test it when loaded.