FS#12255 — FS#16662 — th2-1-a9 <> th2-1-n7

Attached to Project— Network
Modernization
Whole Network
In progress
0%
We will double the capacity between th2-1-a9 and th2-1-n7 to go from 800G to 1.6T.

As a reminder, the infrastructure on the POP is "on a stick"
th2-1-A9 manages the L3 and we are connecting all the waves and the peering / transit to th2-1-n7.

All traffic is added to the links between th2-1-a9 and th2-1-n7.

We will begin to connect the links tonight as of 0:01 am CET.