The A Power of all tracks has crashed. This
caused an overload on channel B which also crashed. The switches are supplied by A + B, which
caused a switch interruption. The servers have
not been affected because they are powered with DC
with each rack that has 30-minute autonomy.
The A Power of all tracks has crashed. This
caused an overload on channel B which also crashed. The switches are supplied by A + B, which
caused a switch interruption. The servers have
not been affected because they are powered with DC
with each rack that has 30-minute autonomy.
We are taking care of the problem.