FS#11381 — FS#15377 — BHS <> MTL

Attached to Project— Network
Modernization
Whole Network
In progress
0%
We have set in production a second piar of fiber on the new optical path BHS <> Montreal. We will gradually switch over 10G circuits.
Comment by OVH - Thursday, 12 November 2015, 20:27PM

We switched 6x10G on the new optical links. (4x10G BHS<>MTL + 2x10G infernal links vrack BHS<>RBX and BHS<>GRA).

However, we have a failure in the pre-amp MTL and so we will replace it with a apare to continue the migration.