FS#11273 — FS#15204 — Racks 28D30 -> 28D17
Attached to Project— Dedicated Cloud
Maintenance | |
Rbx2b | |
Planned | |
![]() |
This Monday, Nov 2nd we will intervene on the cooling system of tracks 28D30 to 28D17.
For 5 to 15 minutes one of the 2 water inlets will be cut to allow the production of a new rack.
The server cooling will be performed by the second water supply.
For 5 to 15 minutes one of the 2 water inlets will be cut to allow the production of a new rack.
The server cooling will be performed by the second water supply.