FS#11223 — FS#15154 — rbx-50ab-a70-vrack
Attached to Project— Network
Modernization | |
Roubaix | |
CLOSED | |
![]() |
We will update this switch pair of vrack3.0. Maintenance is a priority because of the loss on Multicast that was detected on the network.
With this update, multicast packs will be charged in hardware. During maintenance, there will always be a switch online and therefore no loss.
Impact: None
maintenance area: Vrack3.0 roubaix
Schedule: 10 pm
Date: Tuesday, 27 October 2015, 14:02PMWith this update, multicast packs will be charged in hardware. During maintenance, there will always be a switch online and therefore no loss.
Impact: None
maintenance area: Vrack3.0 roubaix
Schedule: 10 pm
Reason for closing: Done
We are starting maintenance.
Maintenance finished.