rssLink RSS for all categories
 
icon_red
icon_green
icon_red
icon_red
icon_blue
icon_green
icon_green
icon_red
icon_red
icon_red
icon_orange
icon_green
icon_green
icon_green
icon_green
icon_blue
icon_green
icon_orange
icon_red
icon_green
icon_red
icon_red
icon_green
icon_red
icon_red
icon_red
icon_red
icon_orange
icon_green
 

FS#11118 — FS#15035 — fex112 p19-92-n6 p19-93-n6

Attached to Project— Network
Incident
paris 19
CLOSED
100%
Following the wiring of one of the uplinks of fex112 on n6. the FEX ports were stopped because of the speed mismatch.
The Fex are dual-attached on 2 nexus6004, when the technician has reconnected the 2nd uplink on p19-92-n6, we found the bug.
For a while, the 2 nexos did not have the same speed on the FEX ports and the VPC stopped the vlans towards the filerz.
This is a known bug, Cisco found the solution and it will be integrated in the future release 7.1.3
Date:  Thursday, 15 October 2015, 15:58PM
Reason for closing:  Done