FS#11084 — FS#14999 — gra1-24ab-n56

Attached to Project— Network
Maintenance
GRA-2
Planned
0%
We will modify the configuration of the high availability protocol in order to increase the size of the switch uplinks in the future.
This change has an impact on production, so we'll do this maintenance is the peak period (6 am)

According to our lab tests the first machines return after 160 seconds. Latest servers should be UP after 420 seconds.

Date of intervention: Friday, October 16th at 06h.
Maintenance area: 5.196.80.0/24,5.196.81.0/24,5.196.82.0/24,5.196.83.0/24
Impact: Loss of ping for 160-420 seconds.