FS#10365 — FS#14231 — rf-1-a1
Attached to Project— Network
Maintenance | |
Backbone EU | |
Planned | |
![]() |
Following the incident on 29 July - https://status.ovh.net/?do=details&id=10307, we've identified several ways of improving the network's resilience and reducing the impact of similar outages.
We will move 2 links between rf-1-a1 and GSW towards TH2. Initially we will go via gsw-1-n7 <> th2-1-n7 to mount the BGP session with th2-1-a9 (today there are 2 rf-1-a1 <> gsw-1-a9 BGP sessions).
When we get the necessary optical links, we will physically move these links: rf-1-a1 will be directly connected to th2-1-n7 to get the best redundancy possible.
This operation should run without any impact and is scheduled for the night of Wednesday (from 00.01am on 05 August).
We will move 2 links between rf-1-a1 and GSW towards TH2. Initially we will go via gsw-1-n7 <> th2-1-n7 to mount the BGP session with th2-1-a9 (today there are 2 rf-1-a1 <> gsw-1-a9 BGP sessions).
When we get the necessary optical links, we will physically move these links: rf-1-a1 will be directly connected to th2-1-n7 to get the best redundancy possible.
This operation should run without any impact and is scheduled for the night of Wednesday (from 00.01am on 05 August).